1. Utility survey is complete.
2.Geotechnical investigation is complete.
3.Bridge foundation type is under
evaluation. 4.
Design is 30 percent complete.
5.
Design is 60 percent complete.
6. Design is 90 percent
complete. 7.
Design is 100 percent complete.
8. Construction to be
determined. |